MLNetworks for TowerCos
See the whole site. Deliver across the portfolio.
Site and tenant records, energy, assets and field work on one platform, from daily uptime to colocation.

Commercial commitments.Operational reality.
01
Manage the site portfolio
Land, lease, site, tenant and contract records held against the site they belong to.
02
Coordinate colocation
Check each tenant request against the site: space, power, structural capacity, and the field work to get it ready.
03
Protect service continuity
Read an alarm next to the site power and the asset behind it, then send the right visit.
From request to readiness
From tenant request to lease-up.
Check what the site has, list the upgrades it needs, and track the work through to handover.
01
Capture tenant requirements
Space, power, timing and commercial terms, held on the request and checked against the site.
ColocationCapacity ReservationsActiveREQ-0417-B
Colocation request
Tenant B - Ridgeview RDG-0417
Requested
Tenant B asks to add equipment on the tower
Capacity checked
Tower EPA, ground space and power checked
Held
Capacity held until the agreement is signed
Agreed
Hold converted to an agreement
Check against the site
- Tower EPA
- Ground space
- Power
Waiting for a person to decideExpires 28 Oct 2026
Convert to agreementRelease hold02
Assess readiness and investment
Review the records on file and list the assessments still required before you commit to the tenant.
Capacity FeasibilityRidgeview RDG-0417Utilization 78.9%Ridgeview RDG-0417
Tower site, 36 m
Installed EPA
14.2 m²
Capacity
18.0 m²
Utilization
78.9%
Headroom
3.8 m²
Sectors
0°
3 items, 4.10 m²
120°
Most loaded4 items, 6.40 m²
240°
3 items, 3.70 m²
03
Coordinate delivery
The approved work, the site visits and the completion photos and job sheets stay on the same site record.
Work & EvidenceWO-7718WO-7718
Inspect generator start circuit
Ridgeview RDG-0417
HighSubmittedSubmitted form
5 of 5 required- Approved
Start circuit inspected
Yes
- Approved
Fault found
Start relay contact worn
- Approved
Action taken
Relay replaced
- Awaiting review
Start test result
Started on first attempt
Attachments (4)
- Start-relay-before.jpg
- Start-relay-after.jpg
- Generator-running.jpg
- Start-test.pdf
Review actions
Pending review - level 1Review comments (required)
Relay replaced and start test recorded on site. Photographs match the checklist.
RejectApprove
Keep the sites you run on air
Related alarms become one incident, shown with the site power and the assets behind it. An approved action becomes a work order that carries the incident with it.
Network Monitoring & Incident ResponseWork order progress
Inspect generator start circuit
WO-7718 · Ridgeview RDG-0417
Prepared
Finding and evidence attached
Dispatched
Field team assigned
On site
Start circuit inspected and repaired
Completion evidence
3 photographs, start test recorded
Customer story
A tower company in the Middle East and North Africa
How a tower company cut its energy use by 8% and said yes to tenants faster
A tower company ran energy, faults, field work and colocation on one platform. Energy use fell by 8%, team productivity rose by 28%, and the alarm count reaching the NOC fell five-fold.
Read the story- 8%
- Energy saved through optimisation across the portfolio
- 28%
- Higher productivity for operations and field teams
- 5x
- Fewer alarms reaching fault management
Where TowerCos usually start
Each one works on the same sites and assets.
- Sites & TenantsSites, leases, tenants and colocation requests in one place.
- Assets & InventoryOne asset register: what is on site and what state it is in.
- Energy ManagementGrid, DG, battery and fuel for each site, against what it should be using.
- Network Monitoring & Incident ResponseRelated alarms become one incident, with a probable cause.
- Workforce & SchedulingDispatch the job and get proof of visit back.
- Investment PlanningCompare options and see why one is recommended.
Works from the records and systems you already run
Integration scope is defined for each deployment, and each source is validated with your team before it is named as supported.
- Site, lease and tenant records
- Site controllers and telemetry
- Alarm and fault systems
- ERP, for assets and purchasing
FAQ
Questions we get asked
Does MLNetworks replace our lease or ERP system?
No. Billing and accounting stay with your ERP. MLNetworks reads the records it needs and shows them next to the alarms, power and assets of each site.
Can it tell us whether a tower can take another tenant?
It shows the capacity and readiness records held for the site and lists the assessments still required. Structural analysis and engineering sign-off stay with your specialists.
Where do we start?
Most deployments start with one workflow, such as site power incidents or colocation requests, and widen from there. Scope and timing are agreed for each deployment.
Who decides what gets done on a site?
Your teams. The platform prepares the finding and proposes the action. A person approves or rejects it.
TowerCos
Which site or tenant request do you want to look at first?
Bring a real case. An MLNetworks expert will walk through it with you.
Talk to an Expert